WATER & INFRASTRUCTURE

Storage shaped around essential infrastructure.

For water operators, utilities and infrastructure owners assessing pumping, treatment and site energy constraints.

Discuss your water & infrastructure project
Soundon battery energy storage for water & infrastructure

THE COMMERCIAL CONTEXT

Start with the constraint.

A credible BESS proposal must begin with measured demand, operating priorities and the connection—not a standard equipment assumption.

Common site pressures

  • Pumping and treatment demand peaks
  • Operational continuity requirements
  • Remote or constrained connections
  • Multi-site energy programmes

Potential BESS applications

  • Assess demand management windows
  • Integrate suitable renewable generation
  • Evaluate control of flexible loads
  • Review site-specific resilience architecture

COMMERCIAL SYSTEM SPOTLIGHT

289kWh / 125kW

From £39,940 delivered. Assess the system against your site’s energy profile.

See the system offer

WHO THIS PAGE IS FOR

The people shaping the project.

01Asset Director02Engineering Manager03Energy Manager04Capital Delivery Lead05Procurement Manager

ASSESSMENT INPUTS

Bring the evidence that changes the answer.

Half-hourly import/export data
Peak demand and supply capacity
Solar generation profile
Planned charging or new loads
Operating hours and critical loads
Target date and commercial objective

YOUR QUESTIONS, ANSWERED

Plan your storage project.

How can battery storage support water & infrastructure?+

Assess demand management windows, Integrate suitable renewable generation, Evaluate control of flexible loads. Suitability depends on measured site demand, tariffs, connection limits and approved engineering design.

Is a 289kWh battery the right size for our site?+

289kWh describes energy capacity; 125kW is the rated output of the featured system. Selection requires half-hourly demand, peak power, solar generation and the intended discharge duration. A larger or smaller configuration may be appropriate.

What information is needed for a quotation?+

Provide site location, half-hourly electricity data, available supply capacity, solar and EV plans, project timescale and installation scope. The current 289kWh offer starts at £39,940 delivered, subject to written quotation; installation and site works are separate.

SYSTEM PATHWAY

289kWh cabinet to multi-MWh container

The appropriate configuration depends on usable site power, duration, operating strategy and the connection pathway.

Start with the 289kWh system