Use more of what you generate.
Assess storage of surplus solar for use when the site needs it.
SOUNDONNEW ENERGY · UK
Assess a project
MANUFACTURER-DIRECT / UK COMMERCIAL BESS
289kWh / 125kW liquid-cooled LFP battery storage, with the core system integrated and the project scope clearly defined.
Subject to final written quotation, site access and project scope. Installation and site works are separate. VAT treatment must be confirmed in the quotation.
STARS SERIES · COMMERCIAL ENERGY STORAGESTART WITH YOUR BUSINESS
Suitability and financial returns depend on your load profile, tariffs, solar generation and connection limits.
Assess storage of surplus solar for use when the site needs it.
Evaluate discharge against suitable demand peaks and tariff windows.
Explore battery support for charging demand within a designed site energy strategy.
THE OFFER, CLEARLY DEFINED
CONNECTION & CONTROL
Integrated iEMS and PCS functionality supports G99 connection and G100 export-limitation planning. Final acceptance depends on the DNO, approved system configuration and site design.
Internal shut-off functionality does not remove the need to assess CTs, fail-safe protection and any required witness testing.
Read the connection scopeDELIVERY & SUPPORT
Current indicative commercial terms, subject to the signed quotation and applicable warranty conditions.
5-year product warranty. Stated performance cover: 10 years / 8,000 cycles, with 70% end-of-life capacity. Conditions and interpretation must be confirmed in writing.
Indicative lead time around two weeks, subject to availability and access. 30% deposit / 70% on shipping.
Annual maintenance plan £700. Monitoring is included for two years; subsequent service scope and any optional £199 top-up are confirmed separately.