Grid-scale battery energy storage system alongside renewable generation
UK GRID READYG99READY

Power that
connects.

Soundon-manufactured commercial and utility-scale LFP storage, brought to the UK through a focused engineering and project-development team.

SOUNDON ENERGY SYSTEMS · UNITED KINGDOM
G99UK grid-ready configuration
6.25 MWhcontainer platform
15 GWhannual capacity*

G99 readiness.
Engineered in.

G99 is central to connecting larger generation and battery storage equipment to UK distribution networks. Soundon’s G99-ready solution gives developers, EPCs and asset owners a stronger starting point for project design and connection planning.

G99 Grid-connection ready

From cell chemistry
to complete systems.

Soundon and Wenergy bring full-chain R&D and manufacturing capability spanning cathode materials, battery cells, modules, packs and integrated energy storage systems.

The 2026 portfolio reports 15GWh annual capacity, 660,000+ m² of R&D and production space, exports to 60+ countries and regions, and more than 1,000 C&I ESS projects.

From cabinet to grid scale.

Commercial, utility and mobile LFP energy storage.

258–385kWh Cabinet ESS supplied by Soundon New Energy UK
STARS SERIES01
SOUNDON · WENERGY

258–385kWh Cabinet ESS

A compact liquid-cooled C&I platform for peak shaving, renewable integration and resilient site power. The 289kWh model is available with G99 and G100-ready functionality.

289kWh · £39,940 delivered
  • 289kWh model · G99 & G100 ready
  • LFP battery chemistry
  • IP55 · liquid-cooled thermal management
125 kW · 258 / 289 / 385 kWh
418kWh Liquid-Cooled ESS supplied by Soundon New Energy UK
STARS CL41802
SOUNDON · WENERGY

418kWh Liquid-Cooled ESS

High-density cabinet storage on a compact footprint, available with 100kW or 210kW rated output for commercial, industrial and renewable-energy applications.

  • 314Ah LFP cells
  • Up to 8,000-cycle design life
  • Modbus TCP/IP · IP55 enclosure
100 / 210 kW · 418 kWh
Integrated Containerised BESS supplied by Soundon New Energy UK
TURTLE CL2.503
SOUNDON · WENERGY

Integrated Containerised BESS

A flexible AC/DC integrated platform with grid-tied, on/off-grid switching and fully off-grid versions for C&I sites, renewable projects and weak-grid applications.

  • 314Ah LFP cells
  • Seamless switching option
  • Liquid cooling · modular PCS architecture
1 MW · 1.67 / 2.089 / 2.5 MWh
Utility-Scale Container ESS supplied by Soundon New Energy UK
TURTLE SERIES04
SOUNDON · WENERGY

Utility-Scale Container ESS

High-density containerised storage for utility renewables, grid services and large industrial sites, engineered for centralised operation and scalable deployment.

  • 314Ah LFP cells
  • Up to 95% DC efficiency
  • IP55 · C4 corrosion protection
1.925–3.125 MW · 3.85–6.25 MWh
Mobile Energy Storage supplied by Soundon New Energy UK
TURTLE M05
SOUNDON · WENERGY

Mobile Energy Storage

Vehicle-mounted energy storage for rapid deployment at EV charging hubs, construction sites, temporary-power applications, emergency backup and mobile microgrids.

  • Automotive-grade liquid cooling
  • Grid-forming PCS
  • Multiple vehicles can operate in parallel
500–1,000 kW · 964–1,929 kWh

*Product information is based on the Wenergy Products Portfolio 2026 and must be confirmed for each UK project. Commercial terms for the 289kWh system are summarised below and remain subject to the final written quotation and site assessment.

Grid-ready storage.
One clear package.

Delivered price£39,940UK delivery included, subject to site and access confirmation
Request the full quotation
01

Included system

  • 289kWh liquid-cooled LFP cabinet
  • PCS, EMS, BMS and fire-protection system
  • iEMS/PCS G99 and G100 functionality
  • Internal G100 shut-off and online commissioning
02

Warranty & performance

  • 5-year product warranty
  • 10-year / 8,000-cycle performance cover
  • 70% end-of-life capacity
  • Spare parts held in an EU warehouse
03

Delivery & payment

  • Indicative lead time: approximately 2 weeks
  • 30% deposit; 70% payable on shipping
  • UK delivery included
  • Factory-direct USD payment option is being confirmed
04

Maintenance & monitoring

  • £700 annual maintenance plan
  • Includes SIM and glycol change/top-up when required
  • Web monitoring free for the first 2 years
  • If the installer maintains the unit, ongoing web monitoring is £199 per year
05

Connection scope

  • External fail-safe switch and CTs are not included
  • A post-installation witness test may be required
  • Final G99/G100 acceptance remains subject to the DNO and site design
  • Installation and site works are quoted separately
06

UK support & options

  • Installer provides maintenance and emergency response
  • Engineering backup from the factory and UK/EU offices
  • Optional galvanised quick-install base: £2,995 each
  • Energy-trading platform available at additional cost

EU customs duty is reported as already paid, so a duplicate 2.7% customs charge is not expected. VAT, import treatment and payment currency are being checked and will be confirmed in the final quotation. Warranty, performance, monitoring and support are governed by the signed commercial terms.

Intelligent control.
Lifecycle support.

01

Cloud-based BMS

Dual-processor monitoring, cloud balancing optimisation and battery-health analytics support safer operation.

02

Open EMS integration

AI-powered forecasting, support for 100+ protocols and open APIs enable integration with customer-owned EMS platforms.

03

Flexible operating modes

Solutions support peak shaving, PV self-consumption, grid services, microgrids, off-grid operation and backup power.

04

Local project support

Project assessment, engineering, commissioning, training, remote support, maintenance and spare-parts planning.

Built around your site.

Practical storage for demanding energy environments.

01

Commercial & industrial

Reduce peak demand, shift load and strengthen operational resilience.

02

Utilities & renewables

Firm renewable output and support flexible, scalable grid infrastructure.

03

EV charging

Support high-power charging where grid capacity is limited or expensive to upgrade.

04

Water & infrastructure

Add dependable stored energy to critical, energy-intensive operations.

Build capability.
Not dependency.

Our staged Technology Licence Agreement model can support local partners from finished-system supply through assembly, CTP integration and cell manufacturing capability.

Explore partnership opportunities
  1. 01Finished systems
  2. 02Local assembly
  3. 03CTP integration
  4. 04Cell production

Let’s engineer a stronger
energy future.

Tell us about your site, required power and capacity, intended application and target connection date. Our UK team will help identify the right next step.