STARS SERIES01258–385kWh Cabinet ESS
Compact liquid-cooled C&I storage for peak management, solar integration and site energy optimisation.
- Output
- 125kW
- Capacity
- 258 / 289 / 385kWh
SOUNDONNEW ENERGY · UK
Assess a project
UK COMMERCIAL & UTILITY BESS
Manufacturer-direct LFP battery storage, built around Soundon cells and managed by Soundon’s own iBMS.
CELL-TO-SYSTEM CONTROL
Soundon has manufactured battery cells in China for more than 12 years. We supply manufacturer-direct systems—not third-party assembled products.
Soundon-manufactured cells are integrated across our packs, cabinets and containerised BESS, while Soundon’s own iBMS provides cell-level monitoring, balancing and protection.
THE CONNECTION ADVANTAGE
Integrated iEMS and PCS functionality gives developers, EPCs and asset owners a stronger starting point for grid-connection design and export-limitation planning.
Final acceptance remains subject to the DNO, site design and any required witness testing. External fail-safe switch and CTs are not included.
PRODUCT RANGE
Liquid-cooled LFP systems for commercial sites, microgrids, renewable projects and utility applications.
STARS SERIES01Compact liquid-cooled C&I storage for peak management, solar integration and site energy optimisation.
STARS CL41802High-density cabinet storage using 314Ah LFP cells, with Modbus TCP/IP integration and an IP55 enclosure.
TURTLE CL2.503Flexible AC/DC integrated storage with grid-tied, switching and off-grid configurations for complex sites.
TURTLE SERIES04High-density liquid-cooled storage for renewable projects, grid services and large industrial sites.
UK COMMERCIAL OFFER
Liquid-cooled LFP storage with PCS, EMS, BMS, fire protection and online commissioning.
BUYER-SPECIFIC SOLUTIONS
Explore the commercial problem first, then define capacity, power, controls and connection scope.
Rooftop solar, fleet charging and constrained grid capacity.
02Refrigeration, solar, demand peaks and customer charging.
03Process loads, motors, cooling and operating schedules.
04Charging demand, import limits and phased electrification.
A BETTER FIRST CONVERSATION
Understand when and how the site uses power.
Peak demand, solar export, charging or resilience.
Match kW, kWh, controls and connection pathway.
Agree engineering, installation, commissioning and support.